Skip to content
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
  • Projects
  • Services
  • About
  • Jobs
  • Contact
  • News
Timber Engineering

23.018

IMMI Bocquet School

Belgium

Brussels

0 sqm

Context

The complete stability mission for the construction of the IMMI Bocquet school includes the demolition of an existing hangar and the construction of a new school building made of cross-laminated timber (CLT). The proposed building has three levels (R+3) and covers a total surface area of 1,800 m². The construction process is designed to minimize the impact on ongoing school activity.

Particularities

The building is constructed almost exclusively of wood, using CLT for walls and floors. This approach enables rapid construction and reduces noise and environmental pollution during construction. The lightweight structure can be adapted to the height of the existing building, while respecting the alignment of the existing façade.

The project is designed to evolve over time, adapting to the school’s changing needs. This flexibility allows for future modifications without compromising the quality or functionality of the building.

Location

Rue des Résédas 51
1070 Anderlecht

Study
2023
– 2024
Execution
2024
–2025
Architect
A229
Client
Institut Marie Immaculée Montjoie
© Copyrights
A229

Modelisation

bureau_étude_ bois_timber_wood_engineering_ CLT_Cross laminated timber_GLT_Bois lamellé collé_ossature bois_lamibois_LVL_Glulam_stabilité_bureau d'étude structure_ingénieur bois_résille_treillis_panneau_circularité_bas carbone_poutre_colonne_école en structure bois_bureau en structure bois_crèche en bois_ batiment bois_RT2020_ European green deal_calcul d'assemblage bois_cadwork_étude d'exécution_calcul_school_ecole_IMMI_IMI_résédas_Marie_Immmaculée_école_A229
bureau_étude_ bois_timber_wood_engineering_ CLT_Cross laminated timber_GLT_Bois lamellé collé_ossature bois_lamibois_LVL_Glulam_stabilité_bureau d'étude structure_ingénieur bois_résille_treillis_panneau_circularité_bas carbone_poutre_colonne_école en structure bois_bureau en structure bois_crèche en bois_ batiment bois_RT2020_ European green deal_calcul d'assemblage bois_cadwork_étude d'exécution_calcul_school_ecole_IMMI_IMI_résédas_Marie_Immmaculée_école_A229
All Projects

Shaping a sustainable future together

We engineer low-carbon structures.
Through close collaboration, we create resilient and responsible solutions for your projects

Send an email
Call us +32 (0) 81 414 899
WOW offices
Linkedin Facebook Instagram

Ney & Partners WOW SRL

  • wow@ney.partners
  • +32 (0)81 414 899
  • Ney Partners WOW
  • Services
  • Projects
  • Team
  • Jobs
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy
  • Ney Partners WOW
  • Services
  • Projects
  • Team
  • Jobs
  • Contact
  • Equipment
  • Sitemap
  • Privacy Policy

This Website Uses Cookies

This website may use cookies to enhance your browsing experience, analyze site traffic, and personalize content. By clicking “Accept All,” you consent to the use of cookies. For more information on how we use cookies, please visit our Privacy Policy.

Accept essential cookies only