Skip to content
  • Projects
  • About
  • Contact
  • News
Menu
  • Projects
  • About
  • Contact
  • News

Timber Engineering

17.016.01

Ekla Tower

Brussels,

Belgium

0 sqm
Project data

Ekla Tower

17.016.01

Brussels,

Belgium

0 sqm

Context

In close collaboration with Atelier de l’Avenir, we studied all the wood-frame curtain walls. The sections of wood were defined but also and especially, the various assemblies. We had to respect the different architectural and technical constraints to precisely design the numerous fastening systems. All the frames were prefabricated in the workshop in order to accelerate the installation on site.

Particularities

Some complex connections were optimized using a finite element analysis.
It was necessary to match the habits of the company and the challenges of prefabrication.

Location
Chau. de Ninove 192, 1080 Molenbeek-Saint-Jean, BELGIUM
Study
2017
– 2018
Execution
2017
– 2019
Architect
B2Ai
Client
RE-VIVE
Contractor
Atelier de l'AvenirBESIX

Construction site

All Projects

Ney & Partners WOW s.p.r.l.

  • wow@ney.partners
  • +32 (0)81 414 899
Linkedin-in Facebook-f Instagram