Construction of the new head office of Hospitalia MLOZ Mutuelle Entraide Hospitalisation.
It is a building whose supporting structure is composed of columns and slabs of reinforced concrete. The building, which will reach the Nearly Zero Energy Building, will receive a wooden curtain wall of 2750 m² net. Due to the large number of frames, the curtain walls are largely cantilevered to the slabs via metal brackets inserted between the boxes.
Rte de Lennik 788A, 1070 Anderlecht